Technical Committee Home Page

Friday
Oct212011

2011 Traffic Count Report

Follow this link for the Traffic Counts of 2011.

Overall, there has been an increase in vehicle traffic and a decrease in bicycle traffic.

With only three years of data it is difficult to say whether the decreasing bicycle trips are a general trend or a function of the weather and the later dates of the traffic counts in 2010 and 2011.

The CVCCo will continue the count in future years.

 

Saturday
Jun262010

Separated bike lane on Dunsmuir Street now open in Vancouver

Take a look excellent information and video

http://vancouver.ca/engsvcs/transport/cycling/separated/index.htm

The Dunsmuir Street two-way separated bike lane now provides a direct connection between the central business district and the Dunsmuir Viaduct bike lane. It is part of phase one of two to connect the Burrard Bridge bike lanes and the separated bike lanes on the Dunsmuir Viaduct.

 

 

Saturday
May152010

Recce Video

Recce of

Ryan Road to Hwy 19 Intersection --- Link

Intersection of Ryan Road and Hwy 19 --- Link

Hwy 19 to 17th Street Bridge --- Link

17th Street across Cliffe to the Bridge and Hwy 19 to Ryan Road --- Link

Ryan Road to Lerwick --- Link

Monday
May032010

Next Meeting - 11 May 10

The next meeting of the Technical Committee will be held at The Broken Spoke 11 May 10 at 5pm.

Agenda

  1. Long term planning for Courtenay
  2. Report to Cycling Public Advisory Committee (CPAC)

Contact Wilf at wdreher@shaw.ca

refs:

Cycling Network Segments

Cycling Network Priorities

Saturday
Feb272010

Welcome

Welcome to the Technical Committee's Home Page.

You will find postings and information on this page, so check back often.

This is a great spot to find out when the committee will be meeting, you will be able to find links to files and other information too.

The Committe Chairman is Wilf Dreher and can be reached by email at wdreher@shaw.ca.